Once the CL and PR forms have been entered in the monitoring system at Land Transport NZ, an implementation report (IR) will be produced and returned to you. The IR is a printout of the recommendations translated into plain English. It can include dates of the implementation of recommendations, and estimated and actual costs of remedial works. At the initial stage, however, the implementation date entries and actual costs will be blank.
Use the IR to check that the recommended remedial works have been correctly entered into the monitoring system. This report can then be taken on-site when checking whether remedial works have been completed. As each recommendation is completed and the implementation dates and costs are known, you can fill in the blanks on the report. When the IR is complete, return it to the local Land Transport NZ office. If the IR has some incomplete implementation dates, the available information will be entered in the system and new forms sent to you. Complete these as the works are implemented and return them to the local Land Transport NZ office.
Examples of IRs are shown in Appendix B (B5-B7).
B5 is an example of an IR produced by the monitoring system. This report shows that a number of the recommendations have been implemented.
B6 is an example of how the report should be updated and edited with new data.
B7 illustrates an alternate report that only lists crash locations and recommendations with missing implementation dates. It includes examples of how this report should be filled in before it is returned to Land Transport NZ.
The following lists the components of the IR and notes where the information is sourced from. Information from most sections of the PR form is automatically transferred to the IR.
| Status | Description |
|---|---|
| 1 | Yes – the recommendation was implemented as suggested. Add the date of implementation of works under the implementation date column. |
| 2 | No – the recommendation has not yet been implemented. No date required. |
| 3 | This code is no longer available. Previously used as ‘monitor only’. |
| 4 | Never – this recommendation will not be implemented. (Changes have occurred or the recommendation has been rejected.) |
| 5 | Never – this recommendation will not be implemented. (Changes have occurred or the recommendation has been rejected.) |
| 6 | Environmental/minor changes only. Environmental changes have occurred or additional minor works have been implemented, but are not considered to supersede the effects of recommendations already implemented. Continue monitoring, as indicated by other implementation dates. Date is optional but desirable. Use this code with all recommendations that have effect = 3 (refer section 3.6). |
This information is also repeated in the crash reduction monitoring system quick reference chart (Appendix E).
Implementation date
Enter the date (the format is year then month, ie YYYYMM, eg 200211) on which the recommended work was implemented. You must enter a date if implementation status is coded 1 or 5. Do not enter a date if the recommended work is not implemented.