Land Transport NZ is now
part of the NZ Transport Agency
www.nzta.govt.nz

Accessibility | Help | Site index | Contact us



You are here: HomeRoadsCrms › Appendix e

Crash reduction monitoring system

Coding manual

Version 3.0

Appendix E Crash reduction monitoring system quick reference chart

Print version: Appendix E (PDF, 38 KB, 4 pages)

Quick reference chart

The following two pages are a smaller version of the information in section 3 and Appendix A. They can be copied back to back and then folded into three to make a simple quick reference chart to be used when completing monitoring forms or implementation reports.

2.88 Transit New Zealand Region Numbers

01 Northland 08 Manawatu - Wanganui
02 Auckland 09 Wellington
03 Waikato 10 Nelson - Marlborough
04 Bay of Plenty 11 Canterbury
05 Taranaki 12 West Coast
06 Gisborne 13 Otago
07 Hawkes Bay 14 Southland

2.11 Site specific location type

01 Signal controlled junction 07 Curve
02 Controlled junction 08 Bridge
03 Uncontrolled junction 09 Pedestrian Crossing location
04 Roundabout 10 Signalled controlled pedestrian crossing facility
05 Grade separated junction 11 Cycle crossing location
06 Driveway/entrance 12 Signal controlled cycle crossing facility
    13 Other (state)

2.13 Road classification codes

Urban, < 80 km/h      Open, >= 80 km/h

Code Urban Code Open
1 Major arterial
20,000+ vpd
6 Motorway
2 Minor arterial
8,0001-20,000 vpd
7 > 5,000 vpd
3 Collector 2,001-8,000 vpd 8 <= 5,000 vpd
4 Local <= 2000 vpd 9 <= 1,000 vpd
5 Accessway 10 <= 200 vpd
    11 <= 50 vpd

3.5 Problem coding

Crash type Code Optional detail Code
All/general 1 Darkness 1
Overtaking 2 Wet road/ice 2
Head-on (bend) 3 Struck roadside object 3
Head-on (straight) 4 Speed 4
Lost-control (bend) 5 Cyclist 5
Lost-control (straight) 6    
Rear-end/obstruction 7    
Crossing 8    
Turning 9    
Merging 10    
Pedestrian 11    
Other 12    

3.8 Implementation status codes

1. Yes - works complete
2. No - works not yet done
3. Not used, was monitoring only
4. works will not be done
5. Works implemented separately from study
6. Environmental/minor change only (Date optional - other dates used for monitoring)

Note:

Implementation status 1 and 5 require a date entry.
Use status 6 for any recommendations with effect = 3.

quick reference chart

quick reference chart

quick reference chart

Page created: 8 August 2005