Land Transport NZ is now
part of the NZ Transport Agency
www.nzta.govt.nz

Accessibility | Help | Site index | Contact us



You are here: HomeRoadsCrms › Appendix b

Crash reduction monitoring system

Coding manual

Version 3.0

Appendix B Examples of forms and reports

Print version: Appendix B (PDF, 117 KB, 8 pages)

B1 - Crash location (CL) form (blank)

Crash location (CL) form

B2 - Problem recommendation (PR) form (blank)

problem recommendation form

B3 - Crash location (CL) form (completed example)

completed example of a CL form

B3 - Crash location (CL) form (completed example)

completed example of a PR form

B5 - Implementation report for a monitored location

Land Transport New Zealand
1
Engineering Section
Crash Reduction Study Monitoring System

IMPLEMENTATION REPORT
Study (Report) Name: EXAMPLE CRS 1993
Location Name:      93R1 MAIN RD (FIRST ST-SECOND ST)
Location No:           1
Study Report Date: 02/1993
Monitoring System Information
IDNO: 123456
Entry Date: 14APR93
Latest Edit: 22AUG00
RECOMMENDATIONS and IMPLEMENTATION (See Notes/Codes below)
RECOMMENDATIONS IMPLEMENTATION
NO. ACTION OBJECT TRAFFIC SIGN EFFECT STATUS DATE
1 Remove/ban TRAFFIC SIGNS PW17 3 6  
2 Trim Trees/vegetation   2 1 199304
3 Move TRAFFIC SIGNS PW66 2 1 199304
4 Install Throat/fishtail   2 2  
5 Upgrade (Improve) LIGHTING   2 5 199206
6 Install Roundabout   1 5 199203
7 Change Stop control   2 1 199307
8 Enlarge (size of) TRAFFIC SIGNS RG5 2 2  
9 Install Centreline-solid   2 1 199309
10 Install Flush medial   2 5 199206
COST OF WORKS
     Estimated Cost    $5,000
     Actual Cost         $
STOP MONITORING??    (yyyy/mm)
Enter a date ONLY when Monitoring should cease (optional)
ENVIRONMENTAL CHANGES



NOTES:

         IMPLEMENTATION STATUS


EFFECT
1. Yes - works complete (Date required) 1. Major
2. No - works not yet done 2. Minor
3. This code is no longer available, was Monitoring Only 3. No effect
4. Works will not be done (No date required)
5. Works implemented separately from study (Date required)
6. Environmental / minor change only (Date optional - other dates used for monitoring)
NOTE: Implementation Status 1 and 5 REQUIRE a date entry

B6 - Updated implementation report

B6 updated implementation report

B7 - Updated not done report

B6 updated not done report

Page created: 8 August 2005